News

Calendar Plan for the Vertebrate Zoology Course in 2012

The cold weather and Euro 2012 thoroughly disrupted the spring semester. Vertebrate zoology classes will be held in a condensed format (which does not mean changes to the requirements for the material that must be studied). Here is the calendar plan for practical sessions, lectures, and the module examination schedule.

The cold weather and Euro 2012 thoroughly disrupted the spring semester. Vertebrate zoology classes will be held in a condensed format (which does not mean changes to the requirements for the material that must be studied). Here is the calendar plan for practical sessions, lectures, and the module examination schedule. MonLecturesTueWedThuFriPractical sessions13.2Origin of chordates14.215.29.210.2Cephalochordates + tunicates20.2Origin of fishes21.222.216.217.2Lampreys (with V.A. — start of cartilaginous fishes)27.2Cartilaginous + Bony fishes in general28.229.223.224.2Module I (up to lampreys) + Cartilaginous fishes5.3Ray-finned fishes6.37.31.32.3Bony fishes12.3Lobe-finned fishes, origin of tetrapods13.314.33.33.3Museum on fishes and herps19.3Amphibians20.321.315.316.3Module II (fishes)26.3History of reptiles27.328.322.323.3Amphibians2.4Diversity of reptiles3.44.429.330.3Reptiles9.4Origin of birds10.411.45.46.4Module III (herps)16.4Diversity of birds17.418.412.413.4Birds23.4Mammals24.425.419.420.4Museum, birds7.5Module IV (birds)8.5?26.44.5Mammals14.5 or 21.5Examination test (Module V and general questions)